In this milestone we aim to create a design for the final product by working architects and designers. We aim to have a professional looking design that will be enticing to students as well as serve their practical needs for innovation and collaboration.
=== <span style="font-size:small">Milestone 6: Construction - Planned April 2018</span><br/> ===
For the construction of our space we aim for it to take as little time as possible, to minimise disturbance for the students, with the construction taking place outside of peak university times.