'''= <span style="font-size:large">Strategy #1 Creation of an innovation space</span>'''<br/> =
Recently, UTS has begun encouraging innovation and entrepreneurship around campus, made evident by starting two team in the University Innovation Fellows program. Created by the previous and new candidate UIF’s at UTS, this strategy aims to provide a place to facilitate innovation collaboration and teamwork for students. Currently this strategy is already off the ground and we have already pitched our ideas to the heads of the Engineering and IT faculty and they are more than enthusiastic with our idea.
'''=== Milestone 1: Initial Stakeholder meeting - <span style="color:#00ff00">Completed</span>'''<br/> ===
What got our project started was when the heads of the Engineering and IT Faculty emailed us expressing interest in re-purposing a previously unused space in the Engineering and IT building.
'''=== Milestone 2: Idea Pitch - <span style="color:#00ff00">Completed</span>'''<br/> ===
Two weeks from our initial stakeholder meeting, we re-scheduled a meeting with the faculty leaders to pitch our ideas. We generated three ideas for our innovation space
'''=== Milestone 3: Investor Pitch - <span style="color:#00ff00">Completed</span>'''<br/> ===
To provide funding for the room, the faculty leaders had a potential investor lined up who was interested to know what kind of opportunities this space could provide for students. We had a short meeting with the investor where we gave him a summarised version of our three pitches and explained why this un used space should be re purposed. Over all the investor had a positive opinion of our ideas and even had his ideas and suggestions to improve our ideas.
'''=== Milestone 4:&nbsp; Project Follow Up – Planned Feb 2018'''<br/> ===
In this milestone we aim to discuss potential strategies to take our ideas to the final stages and eventually turn the innovation space from an idea into a reality.
'''=== Milestone 5: Working with architects or designers – Planned March 2018'''<br/> ===
In this milestone we aim to create a design for the final product by working architects and designers. We aim to have a professional looking design that will be enticing to students as well as serve their practical needs for innovation and collaboration.
'''=== Milestone 6: Construction - Planned April 2018'''<br/> ===
For the construction of our space we aim for it to take as little time as possible, to minimise disturbance for the students, with the construction taking place outside of peak university times.
'''=== Milestone 7: Grand opening - Planned July 2018'''<br/> ===
In this milestone we intend to open our innovation space to the students. It is very rare to see new and interesting spaces open from existing spaces inside UTS, so we aim to have an awesome opening ceremony.