Open main menu

Changes

no edit summary
<span style="font-family: Arial; font-size: 14.6667px; white-space: pre-wrap;">The layout of the building will be entirely dependent on the space that is available and the most useful and powerful resources that we can effectively offer with the space that we have. We will have to pick from the most important pieces of equipment to include in the space and then use our network to outsource and connect with outside shops such as wood shops, or a metal fab shops.</span>
== <span style="font-family: Arial; font-size: 14.6667px; white-space: pre-wrap;">Ordering and installing needed equipment (June 20172018)</span> ==
<span style="font-family: Arial; font-size: 14.6667px; white-space: pre-wrap;">After deciding what type of resources and prototyping equipment we are going to provide we will need to find reputable distributors to purchase the equipment from and qualified people to install the equipment after our buildout.</span>
<div></div> 
== <span id="docs-internal-guid-918852ee-d41a-2537-ea0e-76ddb43be82a"><span style="font-size: 14.6667px; font-family: Arial; vertical-align: baseline; white-space: pre-wrap;">Buildout and installation of equipment (September 2017)</span></span> ==
29

edits