Open main menu

Changes

Priorities:Smith College Student Priorities

125 bytes removed, 8 years ago
no edit summary
== <span style="background-color: transparent; color: rgb(105, 105, 105); font-family: arial, helvetica, sans-serif; font-size: large; white-space: pre-wrap;">Strategy 04: Accommodating for disruptions in campus ecosystem due to library construction</span> ==
<span idfont color="docs-internal-guid-a2659499-e493-43c2-e7dc-df8d255f0b13#000000"><span styleface="font-family: Arial; color: rgb(0, 0, 0)"><span style="font-size:larger14.6667px; white-space: pre-wrap;">The main library at Smith College is under major renovation. &nbsp;It will be under construction for the next two years. &nbsp;Talking to students on campus, this has already disrupted their daily routines from lack of accessibility of walkways (especially for students in wheelchairs) to lack of to study spaces. &nbsp;More students study in their dorm rooms now since their major study spots have disappeared.</span></span></spanfont>
=== <span id="docs-internal-guid-a2659499-e493-43c2-e7dc-df8d255f0b13"><span id="docs-internal-guid-a2659499-e493-43c2-e7dc-df8d255f0b13"><span style="font-size: 18.6667px; font-family: Arial; color: rgb(67, 67, 67); background-color: transparent; font-weight: 400; vertical-align: baseline; white-space: pre-wrap;">Pop-up Study Spaces:</span></span></span> ===
40

edits