<div></div>
== <span id="docs-internal-guid-918852ee-d41a-2537-ea0e-76ddb43be82a"><span style="font-size: 14.6667px; font-family: Arial; vertical-align: baseline; white-space: pre-wrap;">Buildout and installation of equipment (September 20172018)</span></span> ==
<span id="docs-internal-guid-918852ee-d41a-2537-ea0e-76ddb43be82a"><span style="font-size: 14.6667px; font-family: Arial; vertical-align: baseline; white-space: pre-wrap;">This will include the full buildout of the building based on the plans set forth and the installation of the equipment that will be received by this time. The buildout will be a long process but with ample planning and allocation of funds we hope to keep the process streamlined.</span></span>