For the construction of our space we aim for it to take as little time as possible, to minimise disturbance for the students, with the construction taking place outside of peak university times.
== <parsererror span style="display: block; whitefont-spacesize: pre; border: 2px solid #c77; padding: 0 1em 0 1em; marginsmall">Milestone 7: 1em; backgroundGrand opening -color: #fdd; color: black"Planned July 2018</span><br/>== In this milestone we intend to open our innovation space to the students. It is very rare to see new and interesting spaces open from existing spaces inside UTS, so we aim to have an awesome opening ceremony.
== <span style="font-size:large">Strategy #2 Formal Recognition of student involvement in extra-curricular activities</span><br/> ==