Difference between revisions of "Priorities:Loyola University Maryland Student Priorities"

From University Innovation Fellows
Jump to navigation Jump to search
Line 18: Line 18:
 
== <span style="font-size:larger;"><span style="font-family: Arial; vertical-align: baseline; white-space: pre-wrap;">Repair Cafe</span></span> ==
 
== <span style="font-size:larger;"><span style="font-family: Arial; vertical-align: baseline; white-space: pre-wrap;">Repair Cafe</span></span> ==
  
 
+
*<span style="font-size:small;"><span id="docs-internal-guid-f3bdb54e-dd8a-460f-ddd9-638e9ab194a4"><span style="font-family: Arial; vertical-align: baseline; white-space: pre-wrap;">The space provides a low risk environment for students to gain basic knowledge of tools and innovation processes. The space will curate a basis for the I&E platform to take off on campus.</span></span></span>
 
+
*<span style="font-size:small;"><span id="docs-internal-guid-f3bdb54e-dd8a-460f-ddd9-638e9ab194a4"><span style="font-family: Arial; vertical-align: baseline; white-space: pre-wrap;">While the final space will most likely take years to complete a smaller version can begin in a classroom on campus</span></span></span>
*<span id="docs-internal-guid-f3bdb54e-dd8a-460f-ddd9-638e9ab194a4"><span style="font-size: 14.6667px; font-family: Arial; vertical-align: baseline; white-space: pre-wrap;">The space provides a low risk environment for students to gain basic knowledge of tools and innovation processes. The space will curate a basis for the I&E platform to take off on campus.</span></span>
+
*<span style="font-size:small;">In two to three weeks <span style="text-indent: 36pt; font-family: Arial; vertical-align: baseline; white-space: pre-wrap;">funding for the final project should be discussed and the idea should be placed on the</span></span>
*<span id="docs-internal-guid-f3bdb54e-dd8a-460f-ddd9-638e9ab194a4"><span style="font-size: 14.6667px; font-family: Arial; vertical-align: baseline; white-space: pre-wrap;">While the final space will most likely take years to complete a smaller version can begin in a classroom on campus</span></span>
+
*<span style="font-size:small;">By March 15 a room for such a project</span>
*<span style="font-size:larger;">In two to three weeks <span style="text-indent: 36pt; font-family: Arial; vertical-align: baseline; white-space: pre-wrap;">funding for the final project should be discussed and the idea should be placed on the</span></span>
 
*<span style="font-size:larger;">By March 15 a room for such a project</span>
 
  
 
== Strategy #3==
 
== Strategy #3==

Revision as of 01:30, 27 January 2017

Overview

Coming soon: Your Video (Session 5)

Strategy #1: Increasing Cross-Discplinary Collaboration while Gaining Transferrable Skills

Student-led Consulting Firm

  • To maximize undergraduate experience and increase cross-disciplinary collaboration, a group of student possessing technical skills and business acumen would provide business services to fellow students, faculty, and the greater Baltimore community.
  • The organizational structure of the business is as follows: Directors of Strategy, Technology, and Operations Under these three departments, there would lie associate and senior consultants.
  • For individuals who would like to join the team, but lack the technical or business acumen for whatever reason, the on-boarding process will require a “how-to” module. As an additional revenue source, and to inspire high school students, this module will be provided at a premium fee.
  • Based on the early success of the business, there is hope of expansion outside of state [Maryland] lines. Furthermore, to ensure fluid transfer of powers, there will always be a director-in-training
  • Tenative launch date: Fall 2017

Strategy #2 GENERATING INTEREST FROM THE STUDENT BODY AND FACULTY

Repair Cafe

  • The space provides a low risk environment for students to gain basic knowledge of tools and innovation processes. The space will curate a basis for the I&E platform to take off on campus.
  • While the final space will most likely take years to complete a smaller version can begin in a classroom on campus
  • In two to three weeks funding for the final project should be discussed and the idea should be placed on the
  • By March 15 a room for such a project

Strategy #3

Strategy #4

Related Links

Loyola University Maryland

Spring 2017 UIF:

Meghan Reynolds

Christopher Tiffin

Eric Muchisky

Emily Dexter-Thornton